Growth Metrics

Southeast Airport (ASR) Cash from Operations (2017 - 2024)

Historic Cash from Operations for Southeast Airport (ASR) over the last 8 years, with Q4 2024 value amounting to $446.6 million.

  • Southeast Airport's Cash from Operations rose 1764.74% to $446.6 million in Q4 2024 from the same period last year, while for Dec 2024 it was $1.1 billion, marking a year-over-year increase of 1056.6%. This contributed to the annual value of $1.0 billion for FY2024, which is 199.82% up from last year.
  • Latest data reveals that Southeast Airport reported Cash from Operations of $446.6 million as of Q4 2024, which was up 1764.74% from $200.9 million recorded in Q3 2024.
  • Southeast Airport's 5-year Cash from Operations high stood at $446.6 million for Q4 2024, and its period low was -$9.7 million during Q2 2020.
  • Moreover, its 5-year median value for Cash from Operations was $184.7 million (2021), whereas its average is $193.0 million.
  • In the last 5 years, Southeast Airport's Cash from Operations crashed by 10733.05% in 2020 and then soared by 135689.01% in 2021.
  • Southeast Airport's Cash from Operations (Quarter) stood at $95.1 million in 2020, then skyrocketed by 90.15% to $180.9 million in 2021, then soared by 54.55% to $279.6 million in 2022, then skyrocketed by 35.8% to $379.6 million in 2023, then rose by 17.65% to $446.6 million in 2024.
  • Its last three reported values are $446.6 million in Q4 2024, $200.9 million for Q3 2024, and $224.4 million during Q2 2024.