Archrock (AROC) Construction in Progress (2016 - 2025)
Archrock has reported Construction in Progress over the past 16 years, most recently at $95.7 million for Q4 2025.
- Quarterly Construction in Progress fell 23.44% to $95.7 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $95.7 million through Dec 2025, down 23.44% year-over-year, with the annual reading at $95.7 million for FY2025, 23.44% down from the prior year.
- Construction in Progress was $95.7 million for Q4 2025 at Archrock, down from $125.0 million in the prior quarter.
- Over five years, Construction in Progress peaked at $125.0 million in Q4 2024 and troughed at $30.1 million in Q4 2021.
- The 5-year median for Construction in Progress is $92.5 million (2022), against an average of $81.6 million.
- Year-over-year, Construction in Progress skyrocketed 207.31% in 2022 and then crashed 30.05% in 2023.
- A 5-year view of Construction in Progress shows it stood at $30.1 million in 2021, then skyrocketed by 207.31% to $92.5 million in 2022, then tumbled by 30.05% to $64.7 million in 2023, then skyrocketed by 93.2% to $125.0 million in 2024, then dropped by 23.44% to $95.7 million in 2025.
- Per Business Quant, the three most recent readings for AROC's Construction in Progress are $95.7 million (Q4 2025), $125.0 million (Q4 2024), and $64.7 million (Q4 2023).