Agora (API) Construction in Progress (2023 - 2025)

Agora's Construction in Progress history spans 3 years, with the latest figure at $84.2 million for Q4 2025.

  • Quarterly results put Construction in Progress at $84.2 million for Q4 2025, up 89.36% from a year ago — trailing twelve months through Dec 2025 was $84.2 million (up 89.36% YoY), and the annual figure for FY2025 was $84.2 million, up 89.36%.
  • Construction in Progress for Q4 2025 was $84.2 million at Agora, up from $44.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $84.2 million in Q4 2025 to a low of $17.3 million in Q4 2023.
  • The 3-year median for Construction in Progress is $44.5 million (2024), against an average of $48.7 million.
  • The sharpest move saw Construction in Progress surged 156.51% in 2024, then soared 89.36% in 2025.
  • Year by year, Construction in Progress stood at $17.3 million in 2023, then surged by 156.51% to $44.5 million in 2024, then soared by 89.36% to $84.2 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $84.2 million, $44.5 million, and $17.3 million for Q4 2025, Q4 2024, and Q4 2023 respectively.