American Outdoor Brands (AOUT) Construction in Progress (2020 - 2024)
American Outdoor Brands' Construction in Progress history spans 5 years, with the latest figure at $1.0 million for Q2 2024.
- On a quarterly basis, Construction in Progress rose 20.63% to $1.0 million in Q2 2024 year-over-year; TTM through Apr 2024 was $1.0 million, a 20.63% increase, with the full-year FY2024 number at $1.0 million, up 20.63% from a year prior.
- Construction in Progress hit $1.0 million in Q2 2024 for American Outdoor Brands, up from $858000.0 in the prior quarter.
- Over the last five years, Construction in Progress for AOUT hit a ceiling of $1.8 million in Q2 2021 and a floor of $530000.0 in Q2 2020.
- Historically, Construction in Progress has averaged $1.1 million across 5 years, with a median of $1.0 million in 2024.
- Biggest five-year swings in Construction in Progress: skyrocketed 236.6% in 2021 and later tumbled 36.49% in 2022.
- Tracing AOUT's Construction in Progress over 5 years: stood at $530000.0 in 2020, then skyrocketed by 236.6% to $1.8 million in 2021, then tumbled by 36.49% to $1.1 million in 2022, then decreased by 24.27% to $858000.0 in 2023, then grew by 20.63% to $1.0 million in 2024.
- Business Quant data shows Construction in Progress for AOUT at $1.0 million in Q2 2024, $858000.0 in Q2 2023, and $1.1 million in Q2 2022.