Allison Transmission Holdings (ALSN) Construction in Progress (2016 - 2025)
Allison Transmission Holdings (ALSN) has disclosed Construction in Progress for 15 consecutive years, with $119.0 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 63.01% to $119.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $119.0 million through Dec 2025, up 63.01% year-over-year, with the annual reading at $119.0 million for FY2025, 63.01% up from the prior year.
- Construction in Progress hit $119.0 million in Q4 2025 for Allison Transmission Holdings, up from $73.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $119.0 million in Q4 2025 to a low of $68.0 million in Q4 2023.
- Historically, Construction in Progress has averaged $90.0 million across 5 years, with a median of $83.0 million in 2021.
- Biggest five-year swings in Construction in Progress: crashed 36.45% in 2023 and later skyrocketed 63.01% in 2025.
- Year by year, Construction in Progress stood at $83.0 million in 2021, then grew by 28.92% to $107.0 million in 2022, then plummeted by 36.45% to $68.0 million in 2023, then grew by 7.35% to $73.0 million in 2024, then soared by 63.01% to $119.0 million in 2025.
- Business Quant data shows Construction in Progress for ALSN at $119.0 million in Q4 2025, $73.0 million in Q4 2024, and $68.0 million in Q4 2023.