Growth Metrics

Allison Transmission Holdings (ALSN) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Allison Transmission Holdings (ALSN) over the last 9 years, with Q4 2024 value amounting to $73.0 million.

  • Allison Transmission Holdings' Construction in Progress rose 735.29% to $73.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $73.0 million, marking a year-over-year increase of 735.29%. This contributed to the annual value of $73.0 million for FY2024, which is 735.29% up from last year.
  • Latest data reveals that Allison Transmission Holdings reported Construction in Progress of $73.0 million as of Q4 2024, which was up 735.29% from $68.0 million recorded in Q4 2023.
  • Allison Transmission Holdings' Construction in Progress' 5-year high stood at $107.0 million during Q4 2022, with a 5-year trough of $54.0 million in Q4 2020.
  • Over the past 5 years, Allison Transmission Holdings' median Construction in Progress value was $73.0 million (recorded in 2024), while the average stood at $77.0 million.
  • In the last 5 years, Allison Transmission Holdings' Construction in Progress crashed by 6170.21% in 2020 and then soared by 5370.37% in 2021.
  • Over the past 5 years, Allison Transmission Holdings' Construction in Progress (Quarter) stood at $54.0 million in 2020, then skyrocketed by 53.7% to $83.0 million in 2021, then increased by 28.92% to $107.0 million in 2022, then crashed by 36.45% to $68.0 million in 2023, then grew by 7.35% to $73.0 million in 2024.
  • Its Construction in Progress stands at $73.0 million for Q4 2024, versus $68.0 million for Q4 2023 and $107.0 million for Q4 2022.