Growth Metrics

Allison Transmission Holdings (ALSN) Construction in Progress (2016 - 2025)

Allison Transmission Holdings' Construction in Progress history spans 10 years, with the latest figure at $119.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 63.01% year-over-year to $119.0 million; the TTM value through Dec 2025 reached $119.0 million, up 63.01%, while the annual FY2025 figure was $119.0 million, 63.01% up from the prior year.
  • Construction in Progress for Q4 2025 was $119.0 million at Allison Transmission Holdings, up from $73.0 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $119.0 million in Q4 2025 and bottomed at $68.0 million in Q4 2023.
  • The 5-year median for Construction in Progress is $83.0 million (2021), against an average of $90.0 million.
  • The largest annual shift saw Construction in Progress tumbled 36.45% in 2023 before it soared 63.01% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $83.0 million in 2021, then rose by 28.92% to $107.0 million in 2022, then crashed by 36.45% to $68.0 million in 2023, then rose by 7.35% to $73.0 million in 2024, then surged by 63.01% to $119.0 million in 2025.
  • Per Business Quant, the three most recent readings for ALSN's Construction in Progress are $119.0 million (Q4 2025), $73.0 million (Q4 2024), and $68.0 million (Q4 2023).