Growth Metrics

Albemarle (ALB) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Albemarle (ALB) over the last 16 years, with Q4 2025 value amounting to $642.9 million.

  • Albemarle's Construction in Progress fell 3631.82% to $642.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $642.9 million, marking a year-over-year decrease of 3631.82%. This contributed to the annual value of $642.9 million for FY2025, which is 3631.82% down from last year.
  • According to the latest figures from Q4 2025, Albemarle's Construction in Progress is $642.9 million, which was down 3631.82% from $1.0 billion recorded in Q4 2024.
  • Albemarle's Construction in Progress' 5-year high stood at $3.1 billion during Q4 2023, with a 5-year trough of $642.9 million in Q4 2025.
  • Over the past 5 years, Albemarle's median Construction in Progress value was $2.1 billion (recorded in 2021), while the average stood at $1.8 billion.
  • In the last 5 years, Albemarle's Construction in Progress skyrocketed by 3795.8% in 2021 and then plummeted by 6698.78% in 2024.
  • Quarter analysis of 5 years shows Albemarle's Construction in Progress stood at $2.1 billion in 2021, then increased by 9.17% to $2.2 billion in 2022, then skyrocketed by 36.16% to $3.1 billion in 2023, then tumbled by 66.99% to $1.0 billion in 2024, then crashed by 36.32% to $642.9 million in 2025.
  • Its Construction in Progress was $642.9 million in Q4 2025, compared to $1.0 billion in Q4 2024 and $3.1 billion in Q4 2023.