Growth Metrics

Aeries Technology (AERT) Capital Leases (2023 - 2025)

Aeries Technology has reported Capital Leases over the past 3 years, most recently at $75000.0 for Q1 2025.

  • For Q1 2025, Capital Leases fell 53.7% year-over-year to $75000.0; the TTM value through Mar 2025 reached $75000.0, down 53.7%, while the annual FY2025 figure was $75000.0, 53.7% down from the prior year.
  • Capital Leases for Q1 2025 was $75000.0 at Aeries Technology, down from $162000.0 in the prior quarter.
  • Over five years, Capital Leases peaked at $235000.0 in Q1 2023 and troughed at $75000.0 in Q1 2025.
  • A 3-year average of $157333.3 and a median of $162000.0 in 2024 define the central range for Capital Leases.
  • Biggest five-year swings in Capital Leases: tumbled 31.06% in 2024 and later tumbled 53.7% in 2025.
  • Year by year, Capital Leases stood at $235000.0 in 2023, then tumbled by 31.06% to $162000.0 in 2024, then crashed by 53.7% to $75000.0 in 2025.
  • Business Quant data shows Capital Leases for AERT at $75000.0 in Q1 2025, $162000.0 in Q1 2024, and $235000.0 in Q1 2023.