AI Era (AERA) Construction in Progress (2019 - 2021)
Historic Construction in Progress for AI Era (AERA) over the last 3 years, with Q2 2021 value amounting to $172278.0.
- AI Era's Construction in Progress rose 298.9% to $172278.0 in Q2 2021 from the same period last year, while for May 2021 it was $172278.0, marking a year-over-year increase of 298.9%. This contributed to the annual value of $167278.0 for FY2020, which is N/A changed from last year.
- As of Q2 2021, AI Era's Construction in Progress stood at $172278.0, which was up 298.9% from $172278.0 recorded in Q1 2021.
- In the past 5 years, AI Era's Construction in Progress registered a high of $172278.0 during Q4 2020, and its lowest value of $58688.0 during Q2 2019.
- Its 3-year average for Construction in Progress is $151679.7, with a median of $169778.0 in 2020.
- As far as peak fluctuations go, AI Era's Construction in Progress soared by 18502.93% in 2020, and later soared by 298.9% in 2021.
- Quarter analysis of 3 years shows AI Era's Construction in Progress stood at $58688.0 in 2019, then skyrocketed by 193.55% to $172278.0 in 2020, then changed by 0.0% to $172278.0 in 2021.
- Its Construction in Progress was $172278.0 in Q2 2021, compared to $172278.0 in Q1 2021 and $172278.0 in Q4 2020.