ProFrac Holding (ACDC) Construction in Progress (2021 - 2025)
ProFrac Holding has reported Construction in Progress over the past 5 years, most recently at $35.3 million for Q4 2025.
- Quarterly Construction in Progress fell 3.81% to $35.3 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $35.3 million through Dec 2025, down 3.81% year-over-year, with the annual reading at $35.3 million for FY2025, 3.81% down from the prior year.
- Construction in Progress was $35.3 million for Q4 2025 at ProFrac Holding, down from $36.7 million in the prior quarter.
- Over five years, Construction in Progress peaked at $156.1 million in Q4 2022 and troughed at $10.7 million in Q4 2021.
- The 5-year median for Construction in Progress is $57.6 million (2022), against an average of $71.9 million.
- Year-over-year, Construction in Progress skyrocketed 1358.88% in 2022 and then tumbled 58.44% in 2024.
- A 5-year view of Construction in Progress shows it stood at $10.7 million in 2021, then skyrocketed by 1358.88% to $156.1 million in 2022, then tumbled by 43.43% to $88.3 million in 2023, then tumbled by 58.44% to $36.7 million in 2024, then dropped by 3.81% to $35.3 million in 2025.
- Per Business Quant, the three most recent readings for ACDC's Construction in Progress are $35.3 million (Q4 2025), $36.7 million (Q4 2024), and $88.3 million (Q4 2023).