Growth Metrics

ProFrac Holding (ACDC) Construction in Progress (2021 - 2024)

Historic Construction in Progress for ProFrac Holding (ACDC) over the last 4 years, with Q4 2024 value amounting to $36.7 million.

  • ProFrac Holding's Construction in Progress fell 5843.71% to $36.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $36.7 million, marking a year-over-year decrease of 5843.71%. This contributed to the annual value of $36.7 million for FY2024, which is 5843.71% down from last year.
  • Per ProFrac Holding's latest filing, its Construction in Progress stood at $36.7 million for Q4 2024, which was down 5843.71% from $88.3 million recorded in Q4 2023.
  • ProFrac Holding's 5-year Construction in Progress high stood at $156.1 million for Q4 2022, and its period low was $10.7 million during Q4 2021.
  • Moreover, its 4-year median value for Construction in Progress was $72.2 million (2022), whereas its average is $77.2 million.
  • Per our database at Business Quant, ProFrac Holding's Construction in Progress surged by 135887.85% in 2022 and then tumbled by 5843.71% in 2024.
  • Quarter analysis of 4 years shows ProFrac Holding's Construction in Progress stood at $10.7 million in 2021, then soared by 1358.88% to $156.1 million in 2022, then plummeted by 43.43% to $88.3 million in 2023, then tumbled by 58.44% to $36.7 million in 2024.
  • Its last three reported values are $36.7 million in Q4 2024, $88.3 million for Q4 2023, and $156.1 million during Q4 2022.