KPIs & Operating Metrics(New)
Growth Metrics

Alcoa (AA) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Alcoa (AA) over the last 10 years, with Q4 2024 value amounting to $612.0 million.

  • Alcoa's Construction in Progress rose 755.71% to $612.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $612.0 million, marking a year-over-year increase of 755.71%. This contributed to the annual value of $612.0 million for FY2024, which is 755.71% up from last year.
  • Latest data reveals that Alcoa reported Construction in Progress of $612.0 million as of Q4 2024, which was up 755.71% from $569.0 million recorded in Q4 2023.
  • Over the past 5 years, Alcoa's Construction in Progress peaked at $612.0 million during Q4 2024, and registered a low of $288.0 million during Q4 2021.
  • In the last 5 years, Alcoa's Construction in Progress had a median value of $520.0 million in 2022 and averaged $464.8 million.
  • In the last 5 years, Alcoa's Construction in Progress plummeted by 1402.99% in 2021 and then soared by 8055.56% in 2022.
  • Quarter analysis of 5 years shows Alcoa's Construction in Progress stood at $335.0 million in 2020, then dropped by 14.03% to $288.0 million in 2021, then soared by 80.56% to $520.0 million in 2022, then rose by 9.42% to $569.0 million in 2023, then grew by 7.56% to $612.0 million in 2024.
  • Its last three reported values are $612.0 million in Q4 2024, $569.0 million for Q4 2023, and $520.0 million during Q4 2022.