Willamette Valley Vineyards (WVVIP) Construction in Progress (2016 - 2025)
Willamette Valley Vineyards has reported Construction in Progress over the past 14 years, most recently at $645675.0 for Q4 2025.
- Quarterly results put Construction in Progress at $645675.0 for Q4 2025, up 1.97% from a year ago — trailing twelve months through Dec 2025 was $645675.0 (up 1.97% YoY), and the annual figure for FY2025 was $645675.0, up 1.97%.
- Construction in Progress for Q4 2025 was $645675.0 at Willamette Valley Vineyards, up from $626890.0 in the prior quarter.
- Over the last five years, Construction in Progress for WVVIP hit a ceiling of $21.2 million in Q2 2022 and a floor of $626890.0 in Q3 2025.
- Median Construction in Progress over the past 5 years was $1.8 million (2022), compared with a mean of $5.3 million.
- Biggest five-year swings in Construction in Progress: soared 166.11% in 2022 and later crashed 93.02% in 2023.
- Willamette Valley Vineyards' Construction in Progress stood at $14.6 million in 2021, then crashed by 86.01% to $2.0 million in 2022, then crashed by 68.59% to $639840.0 in 2023, then dropped by 1.04% to $633179.0 in 2024, then rose by 1.97% to $645675.0 in 2025.
- The last three reported values for Construction in Progress were $645675.0 (Q4 2025), $626890.0 (Q3 2025), and $633179.0 (Q2 2025) per Business Quant data.