Growth Metrics

Willamette Valley Vineyards (WVVIP) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Willamette Valley Vineyards (WVVIP) over the last 14 years, with Q3 2025 value amounting to $626890.0.

  • Willamette Valley Vineyards' Construction in Progress fell 3524.31% to $626890.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $626890.0, marking a year-over-year decrease of 3524.31%. This contributed to the annual value of $633179.0 for FY2024, which is 104.1% down from last year.
  • As of Q3 2025, Willamette Valley Vineyards' Construction in Progress stood at $626890.0, which was down 3524.31% from $633179.0 recorded in Q2 2025.
  • In the past 5 years, Willamette Valley Vineyards' Construction in Progress registered a high of $21.2 million during Q2 2022, and its lowest value of $626890.0 during Q3 2025.
  • In the last 5 years, Willamette Valley Vineyards' Construction in Progress had a median value of $2.0 million in 2022 and averaged $5.5 million.
  • As far as peak fluctuations go, Willamette Valley Vineyards' Construction in Progress surged by 16610.6% in 2022, and later crashed by 9302.11% in 2023.
  • Over the past 5 years, Willamette Valley Vineyards' Construction in Progress (Quarter) stood at $14.6 million in 2021, then crashed by 86.01% to $2.0 million in 2022, then tumbled by 68.59% to $639840.0 in 2023, then decreased by 1.04% to $633179.0 in 2024, then dropped by 0.99% to $626890.0 in 2025.
  • Its Construction in Progress was $626890.0 in Q3 2025, compared to $633179.0 in Q2 2025 and $652726.0 in Q1 2025.