Tennessee Valley Authority (TVC) Construction in Progress (2016 - 2025)
Tennessee Valley Authority's Construction in Progress history spans 16 years, with the latest figure at $7.2 billion for Q4 2025.
- For Q4 2025, Construction in Progress rose 31.8% year-over-year to $7.2 billion; the TTM value through Dec 2025 reached $7.2 billion, up 31.8%, while the annual FY2025 figure was $6.8 billion, 38.55% up from the prior year.
- Construction in Progress for Q4 2025 was $7.2 billion at Tennessee Valley Authority, up from $6.8 billion in the prior quarter.
- Across five years, Construction in Progress topped out at $7.2 billion in Q4 2025 and bottomed at $2.2 billion in Q2 2021.
- The 5-year median for Construction in Progress is $3.2 billion (2023), against an average of $3.8 billion.
- The largest annual shift saw Construction in Progress increased 1.47% in 2022 before it skyrocketed 65.38% in 2025.
- A 5-year view of Construction in Progress shows it stood at $2.5 billion in 2021, then increased by 6.09% to $2.6 billion in 2022, then grew by 29.34% to $3.4 billion in 2023, then skyrocketed by 58.54% to $5.4 billion in 2024, then soared by 31.8% to $7.2 billion in 2025.
- Per Business Quant, the three most recent readings for TVC's Construction in Progress are $7.2 billion (Q4 2025), $6.8 billion (Q3 2025), and $6.0 billion (Q2 2025).