Growth Metrics

Scully Royalty (SRL) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Scully Royalty (SRL) over the last 17 years, with Q2 2025 value amounting to $13.5 million.

  • Scully Royalty's Construction in Progress fell 7282.96% to $13.5 million in Q2 2025 from the same period last year, while for Jun 2025 it was $13.5 million, marking a year-over-year decrease of 7282.96%. This contributed to the annual value of $313.6 billion for FY2024, which is 563.95% down from last year.
  • As of Q2 2025, Scully Royalty's Construction in Progress stood at $13.5 million, which was down 7282.96% from $313.6 billion recorded in Q4 2024.
  • In the past 5 years, Scully Royalty's Construction in Progress ranged from a high of $404.6 billion in Q4 2021 and a low of $13.5 million during Q2 2025
  • For the 5-year period, Scully Royalty's Construction in Progress averaged around $155.7 billion, with its median value being $49.7 million (2024).
  • In the last 5 years, Scully Royalty's Construction in Progress soared by 20244.25% in 2024 and then tumbled by 7282.96% in 2025.
  • Scully Royalty's Construction in Progress (Quarter) stood at $404.6 billion in 2021, then dropped by 13.42% to $350.3 billion in 2022, then dropped by 5.12% to $332.4 billion in 2023, then fell by 5.64% to $313.6 billion in 2024, then tumbled by 100.0% to $13.5 million in 2025.
  • Its Construction in Progress was $13.5 million in Q2 2025, compared to $313.6 billion in Q4 2024 and $49.7 million in Q2 2024.