Scully Royalty (SRL) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Scully Royalty (SRL) over the last 17 years, with Q2 2025 value amounting to $13.5 million.
- Scully Royalty's Construction in Progress fell 4729.22% to $13.5 million in Q2 2025 from the same period last year, while for Jun 2025 it was $13.5 million, marking a year-over-year decrease of 4729.22%. This contributed to the annual value of $313.6 billion for FY2024, which is 563.95% down from last year.
- As of Q2 2025, Scully Royalty's Construction in Progress stood at $13.5 million, which was down 4729.22% from $313.6 billion recorded in Q4 2024.
- Over the past 5 years, Scully Royalty's Construction in Progress peaked at $404.6 billion during Q4 2021, and registered a low of $13.5 million during Q2 2025.
- For the 5-year period, Scully Royalty's Construction in Progress averaged around $155.7 billion, with its median value being $66.0 million (2023).
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 9340.64% in 2022, then crashed by 6122.61% in 2024.
- Over the past 5 years, Scully Royalty's Construction in Progress (Quarter) stood at $404.6 billion in 2021, then decreased by 13.42% to $350.3 billion in 2022, then decreased by 5.12% to $332.4 billion in 2023, then dropped by 5.64% to $313.6 billion in 2024, then crashed by 100.0% to $13.5 million in 2025.
- Its Construction in Progress stands at $13.5 million for Q2 2025, versus $313.6 billion for Q4 2024 and $25.6 million for Q2 2024.