Growth Metrics

Strategic Storage Trust VI (SGST) Construction in Progress (2021 - 2026)

Strategic Storage Trust VI's quarterly Construction in Progress came in at $8.6 million in Q1 2026, down 22.4% year-on-year from $11.1 million in Q1 2025, and down 58.62% quarter-over-quarter from $20.9 million in Q4 2025.

Strategic Storage Trust VI has reported Construction in Progress for 6 years, with the latest figure at $8.6 million in Q1 2026.

  • For the quarter ending Q1 2026, Construction in Progress fell 22.4% year-over-year to $8.6 million; the trailing twelve-month figure through Mar 2026 stood at $8.6 million (down 22.4% YoY), and the FY2025 full-year result was $20.9 million, up 128.42% from the prior year.
  • Construction in Progress for Q1 2026 stood at $8.6 million, down from $20.9 million in the prior quarter.
  • The five-year high for Construction in Progress was $20.9 million in Q4 2025, with the low at $62122.0 in Q1 2022.
  • Average Construction in Progress over 5 years is $7.3 million, with a median of $7.3 million recorded in 2024.
  • Year-over-year, Construction in Progress jumped 1757.61% in 2023 and slipped 22.4% in 2026.
  • Tracing SGST's Construction in Progress over 5 years: stood at $347308.0 in 2022, then jumped by 1757.61% to $6.5 million in 2023, then soared by 41.74% to $9.1 million in 2024, then jumped by 128.42% to $20.9 million in 2025, then plunged by 58.62% to $8.6 million in 2026.
  • The last three Construction in Progress figures came in at $8.6 million (Q1 2026), $20.9 million (Q4 2025), and $18.1 million (Q3 2025), per Business Quant data.

Historic Data

Download Data 🔒
DateValue
Mar 31, 2026 8.64 Mn
Dec 31, 2025 20.89 Mn
Sep 30, 2025 18.05 Mn
Jun 30, 2025 15.19 Mn
Mar 31, 2025 11.14 Mn
Dec 31, 2024 9.14 Mn
Sep 30, 2024 7.74 Mn
Jun 30, 2024 10.68 Mn
Mar 31, 2024 7.29 Mn
Dec 31, 2023 6.45 Mn
Sep 30, 2023 4.36 Mn
Jun 30, 2023 3.35 Mn
Mar 31, 2023 670,436.00
Dec 31, 2022 347,308.00
Sep 30, 2022 316,345.00
Jun 30, 2022 180,584.00
Mar 31, 2022 62,122.00
Dec 31, 2021 86,987.00