Growth Metrics

Origin Agritech (SEED) Construction in Progress (2018)

Historic Construction in Progress for Origin Agritech (SEED) over the last 3 years, with Q3 2018 value amounting to $619571.4.

  • Origin Agritech's Construction in Progress changed N/A to $619571.4 in Q3 2018 from the same period last year, while for Sep 2018 it was $619571.4, marking a year-over-year change of. This contributed to the annual value of $644957.7 for FY2018, which is N/A changed from last year.
  • As of Q3 2018, Origin Agritech's Construction in Progress stood at $619571.4.
  • Origin Agritech's 5-year Construction in Progress high stood at $619571.4 for Q3 2018, and its period low was $619571.4 during Q3 2018.