Growth Metrics

Origin Agritech (SEED) Construction in Progress (2018)

Origin Agritech has reported Construction in Progress over the past 1 years, most recently at $619571.4 for Q3 2018.

  • Quarterly Construction in Progress changed N/A to $619571.4 in Q3 2018 from the year-ago period, while the trailing twelve-month figure was $619571.4 through Sep 2018, changed N/A year-over-year, with the annual reading at $644957.8 for FY2018, N/A changed from the prior year.
  • Construction in Progress was $619571.4 for Q3 2018 at Origin Agritech.
  • Over five years, Construction in Progress peaked at $619571.4 in Q3 2018 and troughed at $619571.4 in Q3 2018.