ReTo Eco-Solutions (RETO) Construction in Progress (2016 - 2020)
ReTo Eco-Solutions has reported Construction in Progress over the past 5 years, most recently at $200145.0 for Q4 2020.
- Quarterly results put Construction in Progress at $200145.0 for Q4 2020, up 85.92% from a year ago — trailing twelve months through Dec 2020 was $200145.0 (up 85.92% YoY), and the annual figure for FY2020 was $200145.0, up 85.92%.
- Construction in Progress for Q4 2020 was $200145.0 at ReTo Eco-Solutions, up from $107652.0 in the prior quarter.
- Over the last five years, Construction in Progress for RETO hit a ceiling of $11.3 million in Q4 2017 and a floor of $3530.0 in Q4 2018.
- Median Construction in Progress over the past 5 years was $200145.0 (2020), compared with a mean of $3.7 million.
- Biggest five-year swings in Construction in Progress: crashed 99.97% in 2018 and later soared 2949.63% in 2019.
- ReTo Eco-Solutions' Construction in Progress stood at $7.0 million in 2016, then surged by 60.11% to $11.3 million in 2017, then crashed by 99.97% to $3530.0 in 2018, then soared by 2949.63% to $107652.0 in 2019, then soared by 85.92% to $200145.0 in 2020.
- The last three reported values for Construction in Progress were $200145.0 (Q4 2020), $107652.0 (Q4 2019), and $3530.0 (Q4 2018) per Business Quant data.