Recon Technology (RCON) Construction in Progress (2018 - 2025)
Recon Technology (RCON) has disclosed Construction in Progress for 7 consecutive years, with $1.7 million as the latest value for Q2 2025.
- Quarterly Construction in Progress rose 5381.17% to $1.7 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $1.7 million through Jun 2025, up 5381.17% year-over-year, with the annual reading at $1.7 million for FY2025, 5455.68% up from the prior year.
- Construction in Progress hit $1.7 million in Q2 2025 for Recon Technology, up from $30270.1 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.7 million in Q2 2025 to a low of $30270.1 in Q2 2024.
- Historically, Construction in Progress has averaged $479938.8 across 4 years, with a median of $115163.9 in 2021.
- Biggest five-year swings in Construction in Progress: crashed 81.26% in 2022 and later skyrocketed 5381.17% in 2025.
- Year by year, Construction in Progress stood at $193972.1 in 2021, then plummeted by 81.26% to $36355.7 in 2022, then decreased by 16.74% to $30270.1 in 2024, then surged by 5381.17% to $1.7 million in 2025.
- Business Quant data shows Construction in Progress for RCON at $1.7 million in Q2 2025, $30270.1 in Q2 2024, and $36355.7 in Q2 2022.