Growth Metrics

Procaccianti Hotel Reit (PRXK) Construction in Progress (2018 - 2020)

Historic Construction in Progress for Procaccianti Hotel Reit (PRXK) over the last 3 years, with Q1 2020 value amounting to $8027.0.

  • Procaccianti Hotel Reit's Construction in Progress fell 3586.1% to $8027.0 in Q1 2020 from the same period last year, while for Mar 2020 it was $8027.0, marking a year-over-year decrease of 3586.1%. This contributed to the annual value of $12837.0 for FY2018, which is N/A changed from last year.
  • Procaccianti Hotel Reit's Construction in Progress amounted to $8027.0 in Q1 2020, which was down 3586.1% from $12515.0 recorded in Q1 2019.
  • Procaccianti Hotel Reit's Construction in Progress' 5-year high stood at $12837.0 during Q4 2018, with a 5-year trough of $8027.0 in Q1 2020.
  • Over the past 3 years, Procaccianti Hotel Reit's median Construction in Progress value was $12515.0 (recorded in 2019), while the average stood at $11126.3.
  • Within the past 5 years, the most significant YoY rise in Procaccianti Hotel Reit's Construction in Progress was 3586.1% (2020), while the steepest drop was 3586.1% (2020).
  • Quarter analysis of 3 years shows Procaccianti Hotel Reit's Construction in Progress stood at $12837.0 in 2018, then fell by 2.51% to $12515.0 in 2019, then tumbled by 35.86% to $8027.0 in 2020.
  • Its last three reported values are $8027.0 in Q1 2020, $12515.0 for Q1 2019, and $12837.0 during Q4 2018.