Plastec Technologies (PLTYF) Construction in Progress (2016 - 2017)
Plastec Technologies' Construction in Progress history spans 5 years, with the latest figure at $6.3 million for Q4 2017.
- For Q4 2017, Construction in Progress rose 236.92% year-over-year to $6.3 million; the TTM value through Dec 2017 reached $6.3 million, up 236.92%, while the annual FY2017 figure was $6.3 million, 237.81% up from the prior year.
- Construction in Progress reached $6.3 million in Q4 2017 per PLTYF's latest filing, up from $1.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $6.3 million in Q4 2017 to a low of $13161.2 in Q4 2015.
- Average Construction in Progress over 3 years is $2.7 million, with a median of $1.9 million recorded in 2016.
- Peak YoY movement for Construction in Progress: surged 14075.99% in 2016, then skyrocketed 236.92% in 2017.
- A 3-year view of Construction in Progress shows it stood at $13161.2 in 2015, then soared by 14075.99% to $1.9 million in 2016, then surged by 236.92% to $6.3 million in 2017.
- Per Business Quant, the three most recent readings for PLTYF's Construction in Progress are $6.3 million (Q4 2017), $1.9 million (Q4 2016), and $13161.2 (Q4 2015).