Plastec Technologies (PLTYF) Construction in Progress (2016 - 2017)
Plastec Technologies' Construction in Progress history spans 5 years, with the latest figure at $6.3 million for Q4 2017.
- On a quarterly basis, Construction in Progress rose 236.92% to $6.3 million in Q4 2017 year-over-year; TTM through Dec 2017 was $6.3 million, a 236.92% increase, with the full-year FY2017 number at $6.3 million, up 237.81% from a year prior.
- Construction in Progress came in at $6.3 million for Q4 2017, up from $1.9 million in the prior quarter.
- The five-year high for Construction in Progress was $6.3 million in Q4 2017, with the low at $13161.2 in Q4 2015.
- Historically, Construction in Progress has averaged $2.7 million across 3 years, with a median of $1.9 million in 2016.
- Biggest five-year swings in Construction in Progress: surged 14075.99% in 2016 and later skyrocketed 236.92% in 2017.
- Year by year, Construction in Progress stood at $13161.2 in 2015, then skyrocketed by 14075.99% to $1.9 million in 2016, then soared by 236.92% to $6.3 million in 2017.
- Business Quant data shows Construction in Progress for PLTYF at $6.3 million in Q4 2017, $1.9 million in Q4 2016, and $13161.2 in Q4 2015.