Growth Metrics

Peakstone Realty Trust (PKST) Construction in Progress (2016 - 2025)

Peakstone Realty Trust's Construction in Progress history spans 10 years, with the latest figure at $4.2 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 340.02% year-over-year to $4.2 million; the TTM value through Dec 2025 reached $4.2 million, up 340.02%, while the annual FY2025 figure was $4.2 million, 340.02% up from the prior year.
  • Construction in Progress reached $4.2 million in Q4 2025 per PKST's latest filing, up from $2.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $21.5 million in Q3 2021 to a low of $962000.0 in Q4 2024.
  • Average Construction in Progress over 5 years is $5.9 million, with a median of $2.9 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: tumbled 88.51% in 2024, then soared 340.02% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $4.8 million in 2021, then tumbled by 58.14% to $2.0 million in 2022, then soared by 319.81% to $8.4 million in 2023, then crashed by 88.51% to $962000.0 in 2024, then skyrocketed by 340.02% to $4.2 million in 2025.
  • Per Business Quant, the three most recent readings for PKST's Construction in Progress are $4.2 million (Q4 2025), $2.6 million (Q3 2025), and $1.7 million (Q2 2025).