Pg&E (PCG-PX) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Pg&E (PCG-PX) over the last 17 years, with Q4 2025 value amounting to $4.6 billion.
- Pg&E's Construction in Progress rose 379.09% to $4.6 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $4.6 billion, marking a year-over-year increase of 379.09%. This contributed to the annual value of $4.6 billion for FY2025, which is 379.09% up from last year.
- Pg&E's Construction in Progress amounted to $4.6 billion in Q4 2025, which was up 379.09% from $5.1 billion recorded in Q3 2025.
- In the past 5 years, Pg&E's Construction in Progress ranged from a high of $5.1 billion in Q3 2025 and a low of $2.8 billion during Q2 2021
- Over the past 5 years, Pg&E's median Construction in Progress value was $4.4 billion (recorded in 2023), while the average stood at $4.2 billion.
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 3830.09% in 2022, then crashed by 244.11% in 2025.
- Quarter analysis of 5 years shows Pg&E's Construction in Progress stood at $3.5 billion in 2021, then rose by 18.91% to $4.1 billion in 2022, then increased by 7.61% to $4.5 billion in 2023, then rose by 0.13% to $4.5 billion in 2024, then grew by 3.79% to $4.6 billion in 2025.
- Its last three reported values are $4.6 billion in Q4 2025, $5.1 billion for Q3 2025, and $4.6 billion during Q2 2025.