Growth Metrics

Central North Airport (GAERF) Construction in Progress (2019 - 2025)

Historic Construction in Progress for Central North Airport (GAERF) over the last 8 years, with Q2 2025 value amounting to $67.6 million.

  • Central North Airport's Construction in Progress rose 10889.41% to $67.6 million in Q2 2025 from the same period last year, while for Jun 2025 it was $67.6 million, marking a year-over-year increase of 10889.41%. This contributed to the annual value of $78.4 million for FY2024, which is N/A changed from last year.
  • As of Q2 2025, Central North Airport's Construction in Progress stood at $67.6 million, which was up 10889.41% from $78.4 million recorded in Q4 2024.
  • In the past 5 years, Central North Airport's Construction in Progress ranged from a high of $134.7 million in Q4 2022 and a low of $32.3 million during Q2 2024
  • Moreover, its 4-year median value for Construction in Progress was $78.4 million (2024), whereas its average is $79.9 million.
  • As far as peak fluctuations go, Central North Airport's Construction in Progress soared by 4153.23% in 2021, and later skyrocketed by 10889.41% in 2025.
  • Over the past 4 years, Central North Airport's Construction in Progress (Quarter) stood at $86.3 million in 2021, then surged by 56.07% to $134.7 million in 2022, then plummeted by 41.79% to $78.4 million in 2024, then dropped by 13.8% to $67.6 million in 2025.
  • Its Construction in Progress stands at $67.6 million for Q2 2025, versus $78.4 million for Q4 2024 and $32.3 million for Q2 2024.