Organogenesis Holdings (ORGO) Construction in Progress: 2023-2024
Historic Construction in Progress for Organogenesis Holdings (ORGO) over the last 2 years, with Dec 2024 value amounting to $21.9 million.
- Organogenesis Holdings' Construction in Progress rose 33.66% to $27.5 million in Q3 2025 from the same period last year, while for Sep 2025 it was $27.5 million, marking a year-over-year increase of 33.66%. This contributed to the annual value of $21.9 million for FY2024, which is 62.95% down from last year.
- According to the latest figures from FY2024, Organogenesis Holdings' Construction in Progress is $21.9 million, which was down 62.95% from $59.1 million recorded in FY2023.
- In the past 5 years, Organogenesis Holdings' Construction in Progress registered a high of $59.1 million during FY2023, and its lowest value of $21.9 million during FY2024.
- Over the past 2 years, Organogenesis Holdings' median Construction in Progress value was $40.5 million (recorded in 2023), while the average stood at $40.5 million.
- Data for Organogenesis Holdings' Construction in Progress shows a maximum YoY plummeted of 62.95% (in 2024) over the last 5 years.
- Over the past 2 years, Organogenesis Holdings' Construction in Progress (Yearly) stood at $59.1 million in 2023, then slumped by 62.95% to $21.9 million in 2024.