Permex Petroleum (OILCF) Construction in Progress (2022)
Historic Construction in Progress for Permex Petroleum (OILCF) over the last 1 years, with Q3 2022 value amounting to $460306.0.
- Permex Petroleum's Construction in Progress changed N/A to $460306.0 in Q3 2022 from the same period last year, while for Sep 2022 it was $460306.0, marking a year-over-year change of. This contributed to the annual value of $460306.0 for FY2022, which is N/A changed from last year.
- As of Q3 2022, Permex Petroleum's Construction in Progress stood at $460306.0.
- In the past 5 years, Permex Petroleum's Construction in Progress ranged from a high of $460306.0 in Q3 2022 and a low of $460306.0 during Q3 2022