Permex Petroleum (OILCF) Construction in Progress (2022)
Permex Petroleum (OILCF) has 1 years of Construction in Progress data on record, last reported at $460306.0 in Q3 2022.
- For Q3 2022, Construction in Progress changed N/A year-over-year to $460306.0; the TTM value through Sep 2022 reached $460306.0, changed N/A, while the annual FY2022 figure was $460306.0, N/A changed from the prior year.
- Construction in Progress reached $460306.0 in Q3 2022 per OILCF's latest filing.
- Across five years, Construction in Progress topped out at $460306.0 in Q3 2022 and bottomed at $460306.0 in Q3 2022.