Oriental Culture Holding (OCG) Construction in Progress (2022)

Oriental Culture Holding (OCG) has disclosed Construction in Progress for 1 consecutive years, with $599319.0 as the latest value for Q4 2022.

  • Quarterly Construction in Progress changed N/A to $599319.0 in Q4 2022 from the year-ago period, while the trailing twelve-month figure was $599319.0 through Dec 2022, changed N/A year-over-year, with the annual reading at $599319.0 for FY2022, N/A changed from the prior year.
  • Construction in Progress hit $599319.0 in Q4 2022 for Oriental Culture Holding.
  • In the past five years, Construction in Progress ranged from a high of $599319.0 in Q4 2022 to a low of $599319.0 in Q4 2022.