Nstar Electric Co (NSARO) Construction in Progress (2010 - 2012)

Nstar Electric (NSARO) reported Construction in Progress of $189.9 million for Q1 2012, up 17.17% quarter-over-quarter from $162.0 million in Q4 2011.

Nstar Electric Co (NSARO) Construction in Progress (2010 - 2012) Analysis & Trends

Nstar Electric (NSARO) has 3 years of Construction in Progress data on file, last reported at $189.9 million in Q1 2012.

  • Construction in Progress for Q1 2012 came in at $189.9 million, changed N/A year-over-year; the trailing twelve-month figure through Mar 2012 was $189.9 million (changed N/A YoY), and the FY2011 annual result was $162.0 million, up 84.82% from the prior year.
  • Construction in Progress rose to $189.9 million in Q1 2012 per NSARO's latest filing, from $162.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $189.9 million in Q1 2012 and troughed at $87.7 million in Q4 2010.
  • A 3-year average of $145.9 million and a median of $158.0 million in 2011 frame the typical range for Construction in Progress.
  • On a YoY basis, Construction in Progress climbed as much as 84.82% in 2011 and fell as far as 84.82% in 2011.
  • A 3-year view of Construction in Progress shows it stood at $87.7 million in 2010, then surged by 84.82% to $162.0 million in 2011, then rose by 17.17% to $189.9 million in 2012.
  • Business Quant data shows NSARO's Construction in Progress at $189.9 million in Q1 2012, $162.0 million in Q4 2011, and $158.0 million in Q3 2011.

Peer Comparison

Historic Data

Download Data
DateValue
Mar 31, 2012 189.88 Mn
Dec 31, 2011 162.05 Mn
Sep 30, 2011 157.98 Mn
Jun 30, 2011 131.75 Mn
Dec 31, 2010 87.68 Mn