Nstar Electric Co (NSARO) Construction in Progress (2010 - 2012)
Nstar Electric (NSARO) reported Construction in Progress of $189.9 million for Q1 2012, up 17.17% quarter-over-quarter from $162.0 million in Q4 2011.
Nstar Electric Co (NSARO) Construction in Progress (2010 - 2012) Analysis & Trends
Nstar Electric (NSARO) has 3 years of Construction in Progress data on file, last reported at $189.9 million in Q1 2012.
- Construction in Progress for Q1 2012 came in at $189.9 million, changed N/A year-over-year; the trailing twelve-month figure through Mar 2012 was $189.9 million (changed N/A YoY), and the FY2011 annual result was $162.0 million, up 84.82% from the prior year.
- Construction in Progress rose to $189.9 million in Q1 2012 per NSARO's latest filing, from $162.0 million in the prior quarter.
- Over five years, Construction in Progress peaked at $189.9 million in Q1 2012 and troughed at $87.7 million in Q4 2010.
- A 3-year average of $145.9 million and a median of $158.0 million in 2011 frame the typical range for Construction in Progress.
- On a YoY basis, Construction in Progress climbed as much as 84.82% in 2011 and fell as far as 84.82% in 2011.
- A 3-year view of Construction in Progress shows it stood at $87.7 million in 2010, then surged by 84.82% to $162.0 million in 2011, then rose by 17.17% to $189.9 million in 2012.
- Business Quant data shows NSARO's Construction in Progress at $189.9 million in Q1 2012, $162.0 million in Q4 2011, and $158.0 million in Q3 2011.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2012 | 189.88 Mn |
| Dec 31, 2011 | 162.05 Mn |
| Sep 30, 2011 | 157.98 Mn |
| Jun 30, 2011 | 131.75 Mn |
| Dec 31, 2010 | 87.68 Mn |