Inotiv (NOTV) Construction in Progress (2018 - 2022)
Inotiv filings provide 10 years of Construction in Progress readings, the most recent being $40.5 million for Q3 2022.
- Quarterly Construction in Progress rose 987.76% to $40.5 million in Q3 2022 from the year-ago period, while the trailing twelve-month figure was $40.5 million through Sep 2022, up 987.76% year-over-year, with the annual reading at $40.5 million for FY2022, 987.76% up from the prior year.
- Construction in Progress hit $40.5 million in Q3 2022 for Inotiv, up from $3.7 million in the prior quarter.
- Across five years, Construction in Progress topped out at $40.5 million in Q3 2022 and bottomed at $565000.0 in Q3 2018.
- Average Construction in Progress over 5 years is $10.3 million, with a median of $3.7 million recorded in 2021.
- The largest annual shift saw Construction in Progress plummeted 88.05% in 2020 before it skyrocketed 987.76% in 2022.
- Inotiv's Construction in Progress stood at $565000.0 in 2018, then skyrocketed by 963.72% to $6.0 million in 2019, then plummeted by 88.05% to $718000.0 in 2020, then surged by 418.8% to $3.7 million in 2021, then skyrocketed by 987.76% to $40.5 million in 2022.
- Per Business Quant, the three most recent readings for NOTV's Construction in Progress are $40.5 million (Q3 2022), $3.7 million (Q3 2021), and $718000.0 (Q3 2020).