Inotiv (NOTV) Construction in Progress (2018 - 2022)
Historic Construction in Progress for Inotiv (NOTV) over the last 10 years, with Q3 2022 value amounting to $40.5 million.
- Inotiv's Construction in Progress rose 98775.84% to $40.5 million in Q3 2022 from the same period last year, while for Sep 2022 it was $40.5 million, marking a year-over-year increase of 98775.84%. This contributed to the annual value of $40.5 million for FY2022, which is 98775.84% up from last year.
- As of Q3 2022, Inotiv's Construction in Progress stood at $40.5 million, which was up 98775.84% from $3.7 million recorded in Q3 2021.
- In the past 5 years, Inotiv's Construction in Progress ranged from a high of $40.5 million in Q3 2022 and a low of $565000.0 during Q3 2018
- Its 5-year average for Construction in Progress is $10.3 million, with a median of $3.7 million in 2021.
- In the last 5 years, Inotiv's Construction in Progress plummeted by 8805.32% in 2020 and then soared by 98775.84% in 2022.
- Inotiv's Construction in Progress (Quarter) stood at $565000.0 in 2018, then soared by 963.72% to $6.0 million in 2019, then crashed by 88.05% to $718000.0 in 2020, then soared by 418.8% to $3.7 million in 2021, then soared by 987.76% to $40.5 million in 2022.
- Its last three reported values are $40.5 million in Q3 2022, $3.7 million for Q3 2021, and $718000.0 during Q3 2020.