Inotiv (NOTV) Construction in Progress (2018 - 2022)
Inotiv's Construction in Progress history spans 10 years, with the latest figure at $40.5 million for Q3 2022.
- For the quarter ending Q3 2022, Construction in Progress rose 987.76% year-over-year to $40.5 million, compared with a TTM value of $40.5 million through Sep 2022, up 987.76%, and an annual FY2022 reading of $40.5 million, up 987.76% over the prior year.
- Construction in Progress for Q3 2022 was $40.5 million at Inotiv, up from $3.7 million in the prior quarter.
- The five-year high for Construction in Progress was $40.5 million in Q3 2022, with the low at $565000.0 in Q3 2018.
- Average Construction in Progress over 5 years is $10.3 million, with a median of $3.7 million recorded in 2021.
- Year-over-year, Construction in Progress tumbled 88.05% in 2020 and then surged 987.76% in 2022.
- Tracing NOTV's Construction in Progress over 5 years: stood at $565000.0 in 2018, then surged by 963.72% to $6.0 million in 2019, then tumbled by 88.05% to $718000.0 in 2020, then soared by 418.8% to $3.7 million in 2021, then surged by 987.76% to $40.5 million in 2022.
- Per Business Quant, the three most recent readings for NOTV's Construction in Progress are $40.5 million (Q3 2022), $3.7 million (Q3 2021), and $718000.0 (Q3 2020).