Growth Metrics

Inotiv (NOTV) Construction in Progress (2018 - 2022)

Historic Construction in Progress for Inotiv (NOTV) over the last 10 years, with Q3 2022 value amounting to $40.5 million.

  • Inotiv's Construction in Progress rose 98775.84% to $40.5 million in Q3 2022 from the same period last year, while for Sep 2022 it was $40.5 million, marking a year-over-year increase of 98775.84%. This contributed to the annual value of $40.5 million for FY2022, which is 98775.84% up from last year.
  • As of Q3 2022, Inotiv's Construction in Progress stood at $40.5 million, which was up 98775.84% from $3.7 million recorded in Q3 2021.
  • Inotiv's Construction in Progress' 5-year high stood at $40.5 million during Q3 2022, with a 5-year trough of $565000.0 in Q3 2018.
  • For the 5-year period, Inotiv's Construction in Progress averaged around $10.3 million, with its median value being $3.7 million (2021).
  • As far as peak fluctuations go, Inotiv's Construction in Progress tumbled by 8805.32% in 2020, and later skyrocketed by 98775.84% in 2022.
  • Over the past 5 years, Inotiv's Construction in Progress (Quarter) stood at $565000.0 in 2018, then skyrocketed by 963.72% to $6.0 million in 2019, then plummeted by 88.05% to $718000.0 in 2020, then skyrocketed by 418.8% to $3.7 million in 2021, then skyrocketed by 987.76% to $40.5 million in 2022.
  • Its Construction in Progress was $40.5 million in Q3 2022, compared to $3.7 million in Q3 2021 and $718000.0 in Q3 2020.