Nomura Holdings (NMR) Construction in Progress (2020 - 2025)

Historic Construction in Progress for Nomura Holdings (NMR) over the last 8 years, with Q1 2025 value amounting to $135.0 million.

  • Nomura Holdings' Construction in Progress rose 2508.02% to $135.0 million in Q1 2025 from the same period last year, while for Mar 2025 it was $135.0 million, marking a year-over-year increase of 2508.02%. This contributed to the annual value of $135.0 million for FY2025, which is 2508.02% up from last year.
  • As of Q1 2025, Nomura Holdings' Construction in Progress stood at $135.0 million, which was up 2508.02% from $107.9 million recorded in Q1 2024.
  • Nomura Holdings' Construction in Progress' 5-year high stood at $135.0 million during Q1 2025, with a 5-year trough of $604640.1 in Q1 2021.
  • In the last 5 years, Nomura Holdings' Construction in Progress had a median value of $67.6 million in 2022 and averaged $74.1 million.
  • As far as peak fluctuations go, Nomura Holdings' Construction in Progress plummeted by 9530.43% in 2021, and later skyrocketed by 1107589.62% in 2022.
  • Nomura Holdings' Construction in Progress (Quarter) stood at $604640.1 in 2021, then skyrocketed by 11075.9% to $67.6 million in 2022, then decreased by 11.74% to $59.6 million in 2023, then soared by 80.96% to $107.9 million in 2024, then grew by 25.08% to $135.0 million in 2025.
  • Its Construction in Progress stands at $135.0 million for Q1 2025, versus $107.9 million for Q1 2024 and $59.6 million for Q1 2023.