Nomura Holdings (NMR) Construction in Progress (2020 - 2025)

Nomura Holdings has reported Construction in Progress over the past 6 years, most recently at $135.0 million for Q1 2025.

  • For Q1 2025, Construction in Progress rose 25.08% year-over-year to $135.0 million; the TTM value through Mar 2025 reached $135.0 million, up 25.08%, while the annual FY2025 figure was $135.0 million, 25.08% up from the prior year.
  • Construction in Progress for Q1 2025 was $135.0 million at Nomura Holdings, up from $107.9 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $135.0 million in Q1 2025 and troughed at $604640.1 in Q1 2021.
  • A 5-year average of $74.1 million and a median of $67.6 million in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: plummeted 95.3% in 2021 and later soared 11075.9% in 2022.
  • Year by year, Construction in Progress stood at $604640.1 in 2021, then soared by 11075.9% to $67.6 million in 2022, then fell by 11.74% to $59.6 million in 2023, then skyrocketed by 80.96% to $107.9 million in 2024, then grew by 25.08% to $135.0 million in 2025.
  • Business Quant data shows Construction in Progress for NMR at $135.0 million in Q1 2025, $107.9 million in Q1 2024, and $59.6 million in Q1 2023.