Nextera Energy (NEE-PS) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Nextera Energy (NEE-PS) over the last 17 years, with Q4 2025 value amounting to $24.6 billion.
- Nextera Energy's Construction in Progress rose 1338.07% to $24.6 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $24.6 billion, marking a year-over-year increase of 1338.07%. This contributed to the annual value of $24.6 billion for FY2025, which is 1338.07% up from last year.
- According to the latest figures from Q4 2025, Nextera Energy's Construction in Progress is $24.6 billion, which was up 1338.07% from $21.7 billion recorded in Q4 2024.
- Over the past 5 years, Nextera Energy's Construction in Progress peaked at $24.6 billion during Q4 2025, and registered a low of $14.1 billion during Q4 2021.
- Its 5-year average for Construction in Progress is $18.9 billion, with a median of $18.7 billion in 2023.
- Per our database at Business Quant, Nextera Energy's Construction in Progress skyrocketed by 3291.66% in 2021 and then skyrocketed by 1084.79% in 2022.
- Over the past 5 years, Nextera Energy's Construction in Progress (Quarter) stood at $14.1 billion in 2021, then increased by 10.85% to $15.7 billion in 2022, then increased by 18.99% to $18.7 billion in 2023, then rose by 16.12% to $21.7 billion in 2024, then increased by 13.38% to $24.6 billion in 2025.
- Its last three reported values are $24.6 billion in Q4 2025, $21.7 billion for Q4 2024, and $18.7 billion during Q4 2023.