Nano Labs (NA) Construction in Progress (2022 - 2024)
Nano Labs (NA) posted Construction in Progress of $23508.6 for Q2 2024, down 99.9% sequentially from $22.9 million in Q4 2023.
Analysis
Nano Labs (NA) Construction in Progress (2022 - 2024) Analysis & Trends
Nano Labs has reported Construction in Progress for 3 years, with the latest figure at $23508.6 in Q2 2024.
- Quarterly Construction in Progress changed N/A year-over-year to $23508.6 in Q2 2024, while the trailing twelve-month figure through Jun 2024 was $23508.6 (changed N/A YoY) and the FY2023 annual result came in at $22.9 million, up 912.47% from the prior year.
- Construction in Progress slipped to $23508.6 in Q2 2024 per NA's latest filing, from $22.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $22.9 million in Q4 2023 and troughed at $23508.6 in Q2 2024.
- A 3-year average of $8.4 million and a median of $2.3 million in 2022 frame the typical range for Construction in Progress.
- The widest YoY moves for Construction in Progress: up 912.47% in 2023, down 912.47% in 2023.
- Over 3 years, Construction in Progress stood at $2.3 million in 2022, then jumped by 912.47% to $22.9 million in 2023, then slumped by 99.9% to $23508.6 in 2024.
- According to Business Quant data, Construction in Progress over the past three periods registered $23508.6, $22.9 million, and $2.3 million for Q2 2024, Q4 2023, and Q4 2022 respectively.
Peer Set
Peer Comparison
Historic Data
Download Data
Historic Data
| Date | Value |
|---|---|
| Jun 30, 2024 | 23,508.62 |
| Dec 31, 2023 | 22.95 Mn |
| Dec 31, 2022 | 2.27 Mn |