Mainz Biomed (MYNZ) Construction in Progress (2024)
Historic Construction in Progress for Mainz Biomed (MYNZ) over the last 1 years, with Q4 2024 value amounting to $47449.0.
- Mainz Biomed's Construction in Progress changed N/A to $47449.0 in Q4 2024 from the same period last year, while for Dec 2024 it was $47449.0, marking a year-over-year change of. This contributed to the annual value of $47449.0 for FY2024, which is N/A changed from last year.
- Latest data reveals that Mainz Biomed reported Construction in Progress of $47449.0 as of Q4 2024.
- Mainz Biomed's 5-year Construction in Progress high stood at $47449.0 for Q4 2024, and its period low was $47449.0 during Q4 2024.