Growth Metrics

Mueller Water Products (MWA) Construction in Progress (2016 - 2025)

Mueller Water Products' Construction in Progress history spans 16 years, with the latest figure at $62.9 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 21.66% year-over-year to $62.9 million; the TTM value through Dec 2025 reached $62.9 million, up 21.66%, while the annual FY2025 figure was $53.7 million, 18.81% up from the prior year.
  • Construction in Progress for Q4 2025 was $62.9 million at Mueller Water Products, up from $53.7 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $110.1 million in Q4 2022 and bottomed at $36.9 million in Q3 2023.
  • The 5-year median for Construction in Progress is $56.6 million (2023), against an average of $66.0 million.
  • The largest annual shift saw Construction in Progress surged 45.82% in 2021 before it tumbled 64.76% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $91.5 million in 2021, then grew by 20.33% to $110.1 million in 2022, then tumbled by 63.22% to $40.5 million in 2023, then rose by 27.65% to $51.7 million in 2024, then increased by 21.66% to $62.9 million in 2025.
  • Per Business Quant, the three most recent readings for MWA's Construction in Progress are $62.9 million (Q4 2025), $53.7 million (Q3 2025), and $47.2 million (Q2 2025).