Growth Metrics

Mueller Water Products (MWA) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Mueller Water Products (MWA) over the last 16 years, with Q4 2025 value amounting to $62.9 million.

  • Mueller Water Products' Construction in Progress rose 2166.34% to $62.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $62.9 million, marking a year-over-year increase of 2166.34%. This contributed to the annual value of $53.7 million for FY2025, which is 1880.53% up from last year.
  • Mueller Water Products' Construction in Progress amounted to $62.9 million in Q4 2025, which was up 2166.34% from $53.7 million recorded in Q3 2025.
  • Mueller Water Products' 5-year Construction in Progress high stood at $110.1 million for Q4 2022, and its period low was $36.9 million during Q3 2023.
  • Its 5-year average for Construction in Progress is $66.0 million, with a median of $56.6 million in 2023.
  • Per our database at Business Quant, Mueller Water Products' Construction in Progress skyrocketed by 4581.88% in 2021 and then plummeted by 6475.64% in 2023.
  • Quarter analysis of 5 years shows Mueller Water Products' Construction in Progress stood at $91.5 million in 2021, then grew by 20.33% to $110.1 million in 2022, then plummeted by 63.22% to $40.5 million in 2023, then increased by 27.65% to $51.7 million in 2024, then grew by 21.66% to $62.9 million in 2025.
  • Its Construction in Progress stands at $62.9 million for Q4 2025, versus $53.7 million for Q3 2025 and $47.2 million for Q2 2025.