Mueller Water Products (MWA) Construction in Progress (2016 - 2025)
Mueller Water Products (MWA) has disclosed Construction in Progress for 16 consecutive years, with $62.9 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 21.66% to $62.9 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $62.9 million through Dec 2025, up 21.66% year-over-year, with the annual reading at $53.7 million for FY2025, 18.81% up from the prior year.
- Construction in Progress hit $62.9 million in Q4 2025 for Mueller Water Products, up from $53.7 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $110.1 million in Q4 2022 to a low of $36.9 million in Q3 2023.
- Historically, Construction in Progress has averaged $66.0 million across 5 years, with a median of $56.6 million in 2023.
- Biggest five-year swings in Construction in Progress: soared 45.82% in 2021 and later crashed 64.76% in 2023.
- Year by year, Construction in Progress stood at $91.5 million in 2021, then increased by 20.33% to $110.1 million in 2022, then crashed by 63.22% to $40.5 million in 2023, then grew by 27.65% to $51.7 million in 2024, then rose by 21.66% to $62.9 million in 2025.
- Business Quant data shows Construction in Progress for MWA at $62.9 million in Q4 2025, $53.7 million in Q3 2025, and $47.2 million in Q2 2025.