Mueller Water Products (MWA) Construction in Progress (2016 - 2026)
Mueller Water Products' Construction in Progress history spans 16 years, with the latest figure at $62.9 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 21.66% to $62.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $62.9 million, a 21.66% increase, with the full-year FY2025 number at $53.7 million, up 18.81% from a year prior.
- Construction in Progress hit $62.9 million in Q4 2025 for Mueller Water Products, up from $53.7 million in the prior quarter.
- Over the last five years, Construction in Progress for MWA hit a ceiling of $110.1 million in Q4 2022 and a floor of $36.9 million in Q3 2023.
- Historically, Construction in Progress has averaged $66.0 million across 5 years, with a median of $56.6 million in 2023.
- Biggest five-year swings in Construction in Progress: soared 45.82% in 2021 and later crashed 64.76% in 2023.
- Tracing MWA's Construction in Progress over 5 years: stood at $91.5 million in 2021, then grew by 20.33% to $110.1 million in 2022, then tumbled by 63.22% to $40.5 million in 2023, then rose by 27.65% to $51.7 million in 2024, then increased by 21.66% to $62.9 million in 2025.
- Business Quant data shows Construction in Progress for MWA at $62.9 million in Q4 2025, $53.7 million in Q3 2025, and $47.2 million in Q2 2025.