Growth Metrics

Marvion (MVNC) Construction in Progress (2023 - 2025)

Marvion filings provide 3 years of Construction in Progress readings, the most recent being $800252.0 for Q1 2025.

  • On a quarterly basis, Construction in Progress changed N/A to $800252.0 in Q1 2025 year-over-year; TTM through Mar 2025 was $800252.0, a N/A change, with the full-year FY2024 number at $399780.0, down 54.92% from a year prior.
  • Construction in Progress hit $800252.0 in Q1 2025 for Marvion, up from $399780.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.3 million in Q3 2024 to a low of $399780.0 in Q4 2024.
  • Median Construction in Progress over the past 3 years was $843574.0 (2023), compared with a mean of $845075.8.
  • The widest YoY moves for Construction in Progress: up 54.92% in 2024, down 54.92% in 2024.
  • Marvion's Construction in Progress stood at $886896.0 in 2023, then plummeted by 54.92% to $399780.0 in 2024, then soared by 100.17% to $800252.0 in 2025.
  • The last three reported values for Construction in Progress were $800252.0 (Q1 2025), $399780.0 (Q4 2024), and $1.3 million (Q3 2024) per Business Quant data.