Maase (MAAS) Construction in Progress (2024 - 2025)
Maase (MAAS) has disclosed Construction in Progress for 2 consecutive years, with $7.4 million as the latest value for Q2 2025.
- On a quarterly basis, Construction in Progress changed 0.08% to $7.4 million in Q2 2025 year-over-year; TTM through Jun 2025 was $7.4 million, a 0.08% change, with the full-year FY2025 number at $7.4 million, changed 0.38% from a year prior.
- Construction in Progress was $7.4 million for Q2 2025 at Maase, roughly flat from $7.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $7.4 million in Q2 2025 to a low of $7.4 million in Q2 2024.