Gladstone Land (LANDP) Construction in Progress (2023 - 2025)
Historic Construction in Progress for Gladstone Land (LANDP) over the last 3 years, with Q3 2025 value amounting to $1.5 million.
- Gladstone Land's Construction in Progress rose 714.29% to $1.5 million in Q3 2025 from the same period last year, while for Sep 2025 it was $1.5 million, marking a year-over-year increase of 714.29%. This contributed to the annual value of $1.4 million for FY2024, which is 2222.22% down from last year.
- As of Q3 2025, Gladstone Land's Construction in Progress stood at $1.5 million, which was up 714.29% from $1.4 million recorded in Q2 2025.
- Over the past 5 years, Gladstone Land's Construction in Progress peaked at $1.8 million during Q4 2023, and registered a low of $1.4 million during Q2 2024.
- In the last 3 years, Gladstone Land's Construction in Progress had a median value of $1.4 million in 2024 and averaged $1.5 million.
- As far as peak fluctuations go, Gladstone Land's Construction in Progress plummeted by 2222.22% in 2024, and later soared by 714.29% in 2025.
- Gladstone Land's Construction in Progress (Quarter) stood at $1.8 million in 2023, then decreased by 22.22% to $1.4 million in 2024, then grew by 7.14% to $1.5 million in 2025.
- Its last three reported values are $1.5 million in Q3 2025, $1.4 million for Q2 2025, and $1.4 million during Q1 2025.