JX Luxventure (JXG) Construction in Progress (2018 - 2019)
JX Luxventure's Construction in Progress history spans 5 years, with the latest figure at $12.0 million for Q1 2019.
- On a quarterly basis, Construction in Progress changed N/A to $12.0 million in Q1 2019 year-over-year; TTM through Mar 2019 was $12.0 million, a N/A change, with the full-year FY2018 number at $12.2 million, changed N/A from a year prior.
- Construction in Progress hit $12.0 million in Q1 2019 for JX Luxventure, down from $12.2 million in the prior quarter.
- Over the last five years, Construction in Progress for JXG hit a ceiling of $23.3 million in Q2 2015 and a floor of $2863.0 in Q1 2016.
- Historically, Construction in Progress has averaged $14.1 million across 4 years, with a median of $12.2 million in 2018.
- Biggest five-year swings in Construction in Progress: surged 39.81% in 2015 and later crashed 99.99% in 2016.
- Tracing JXG's Construction in Progress over 4 years: stood at $23.3 million in 2015, then tumbled by 99.99% to $2863.0 in 2016, then surged by 425111.6% to $12.2 million in 2018, then decreased by 1.65% to $12.0 million in 2019.
- Business Quant data shows Construction in Progress for JXG at $12.0 million in Q1 2019, $12.2 million in Q4 2018, and $2863.0 in Q1 2016.