Integrated Media Technology (IMTE) Construction in Progress (2016 - 2020)
Integrated Media Technology filings provide 5 years of Construction in Progress readings, the most recent being -$82268.4 for Q2 2020.
- On a quarterly basis, Construction in Progress rose 75.09% to -$82268.4 in Q2 2020 year-over-year; TTM through Jun 2020 was -$82268.4, a 75.09% increase, with the full-year FY2019 number at $2.5 million, up 10.7% from a year prior.
- Construction in Progress hit -$82268.4 in Q2 2020 for Integrated Media Technology, down from $2.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $2.5 million in Q4 2019 to a low of -$330270.6 in Q2 2019.
- Median Construction in Progress over the past 5 years was $2.1 million (2016), compared with a mean of $1.4 million.
- Biggest five-year swings in Construction in Progress: grew 15.4% in 2019 and later soared 75.09% in 2020.
- Integrated Media Technology's Construction in Progress stood at $2.2 million in 2016, then increased by 1.47% to $2.2 million in 2017, then decreased by 2.47% to $2.1 million in 2018, then rose by 15.4% to $2.5 million in 2019, then crashed by 103.33% to -$82268.4 in 2020.
- The last three reported values for Construction in Progress were -$82268.4 (Q2 2020), $2.5 million (Q4 2019), and -$330270.6 (Q2 2019) per Business Quant data.