HUTCHMED (China) Ltd (HCM) Construction in Progress (2015 - 2016)
HUTCHMED (China)'s (HCM) quarterly Construction in Progress came in at $406000.0 in Q2 2016, down 28.4% quarter-over-quarter from $567000.0 in Q4 2015.
Analysis
HUTCHMED (China) Ltd (HCM) Construction in Progress (2015 - 2016) Analysis & Trends
HUTCHMED (China) (HCM) has reported Construction in Progress for 2 consecutive years, with $406000.0 the latest figure, recorded in Q2 2016.
- On a quarterly basis, Construction in Progress changed N/A year-over-year to $406000.0 in Q2 2016; TTM through Jun 2016 was $406000.0, a N/A change from a year earlier, with the FY2015 full-year figure at $567000.0, changed N/A from the prior year.
- Construction in Progress was $406000.0 for Q2 2016 at HUTCHMED (China), down from $567000.0 in the prior quarter.
- Over five years, Construction in Progress peaked at $567000.0 in Q4 2015 and troughed at $406000.0 in Q2 2016.
Peer Set