Growth Metrics

Givemepower (GMPW) Construction in Progress (2021 - 2022)

Givemepower (GMPW) has disclosed Construction in Progress for 2 consecutive years, with $109969.0 as the latest value for Q1 2022.

  • On a quarterly basis, Construction in Progress changed N/A to $109969.0 in Q1 2022 year-over-year; TTM through Mar 2022 was $109969.0, a N/A change, with the full-year FY2021 number at $31890.0, changed N/A from a year prior.
  • Construction in Progress was $109969.0 for Q1 2022 at Givemepower, up from $31890.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $109969.0 in Q1 2022 to a low of $10000.0 in Q2 2021.