Four Seasons Education (Cayman) (FEDU) Construction in Progress (2018 - 2025)
Historic Construction in Progress for Four Seasons Education (Cayman) (FEDU) over the last 8 years, with Q1 2025 value amounting to $64726.0.
- Four Seasons Education (Cayman)'s Construction in Progress fell 9927.79% to $64726.0 in Q1 2025 from the same period last year, while for Feb 2025 it was $64726.0, marking a year-over-year decrease of 9927.79%. This contributed to the annual value of $65000.0 for FY2025, which is 9926.74% down from last year.
- As of Q1 2025, Four Seasons Education (Cayman)'s Construction in Progress stood at $64726.0, which was down 9927.79% from $9.0 million recorded in Q1 2024.
- Four Seasons Education (Cayman)'s 5-year Construction in Progress high stood at $9.0 million for Q1 2024, and its period low was $64726.0 during Q1 2025.
- For the 5-year period, Four Seasons Education (Cayman)'s Construction in Progress averaged around $2.2 million, with its median value being $802474.6 (2022).
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 68098.3% in 2024, then tumbled by 9927.79% in 2025.
- Quarter analysis of 5 years shows Four Seasons Education (Cayman)'s Construction in Progress stood at $112234.9 in 2021, then soared by 615.0% to $802474.6 in 2022, then skyrocketed by 43.02% to $1.1 million in 2023, then surged by 680.98% to $9.0 million in 2024, then crashed by 99.28% to $64726.0 in 2025.
- Its Construction in Progress stands at $64726.0 for Q1 2025, versus $9.0 million for Q1 2024 and $1.1 million for Q1 2023.