EZGO Technologies (EZGO) Construction in Progress (2022 - 2025)

Historic Construction in Progress for Technologies (EZGO) over the last 3 years, with Q1 2025 value amounting to -$1.3 million.

  • Technologies' Construction in Progress changed N/A to -$1.3 million in Q1 2025 from the same period last year, while for Mar 2025 it was -$1.3 million, marking a year-over-year change of. This contributed to the annual value of $3.1 million for FY2023, which is 473263.77% up from last year.
  • As of Q1 2025, Technologies' Construction in Progress stood at -$1.3 million.
  • Technologies' Construction in Progress' 5-year high stood at $3.1 million during Q3 2023, with a 5-year trough of -$1.3 million in Q1 2025.
  • For the 3-year period, Technologies' Construction in Progress averaged around $620199.3, with its median value being $64064.0 (2022).
  • Data for Technologies' Construction in Progress shows a peak YoY increase of 473263.77% (in 2023) and a maximum YoY decrease of 473263.77% (in 2023) over the last 5 years.
  • Over the past 3 years, Technologies' Construction in Progress (Quarter) stood at $64064.0 in 2022, then soared by 4732.64% to $3.1 million in 2023, then plummeted by 141.97% to -$1.3 million in 2025.
  • Its Construction in Progress was -$1.3 million in Q1 2025, compared to $3.1 million in Q3 2023 and $64064.0 in Q3 2022.