Exact Sciences (EXAS) Construction in Progress (2016 - 2025)
Exact Sciences has reported Construction in Progress over the past 13 years, most recently at $15.3 million for Q4 2025.
- Quarterly Construction in Progress fell 71.13% to $15.3 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $15.3 million through Dec 2025, down 71.13% year-over-year, with the annual reading at $15.3 million for FY2025, 71.13% down from the prior year.
- Construction in Progress was $15.3 million for Q4 2025 at Exact Sciences, down from $84.4 million in the prior quarter.
- Over five years, Construction in Progress peaked at $165.4 million in Q2 2022 and troughed at $200000.0 in Q4 2021.
- The 5-year median for Construction in Progress is $81.8 million (2023), against an average of $67.3 million.
- Year-over-year, Construction in Progress tumbled 93.75% in 2021 and then skyrocketed 22500.0% in 2022.
- A 5-year view of Construction in Progress shows it stood at $200000.0 in 2021, then skyrocketed by 22500.0% to $45.2 million in 2022, then crashed by 85.4% to $6.6 million in 2023, then skyrocketed by 703.03% to $53.0 million in 2024, then tumbled by 71.13% to $15.3 million in 2025.
- Per Business Quant, the three most recent readings for EXAS's Construction in Progress are $15.3 million (Q4 2025), $84.4 million (Q3 2025), and $85.6 million (Q2 2025).