Digital Realty Trust (DLR-PJ) Construction in Progress (2018 - 2025)
Historic Construction in Progress for Digital Realty Trust (DLR-PJ) over the last 8 years, with Q4 2025 value amounting to $5.0 billion.
- Digital Realty Trust's Construction in Progress fell 363.16% to $5.0 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $5.0 billion, marking a year-over-year decrease of 363.16%. This contributed to the annual value of $5.0 billion for FY2025, which is 363.16% down from last year.
- Latest data reveals that Digital Realty Trust reported Construction in Progress of $5.0 billion as of Q4 2025, which was down 363.16% from $5.4 billion recorded in Q3 2025.
- Digital Realty Trust's Construction in Progress' 5-year high stood at $5.4 billion during Q3 2025, with a 5-year trough of $2.9 billion in Q1 2021.
- Its 5-year average for Construction in Progress is $4.4 billion, with a median of $4.6 billion in 2023.
- As far as peak fluctuations go, Digital Realty Trust's Construction in Progress skyrocketed by 4903.69% in 2022, and later plummeted by 363.16% in 2025.
- Digital Realty Trust's Construction in Progress (Quarter) stood at $3.2 billion in 2021, then surged by 49.04% to $4.8 billion in 2022, then dropped by 3.21% to $4.6 billion in 2023, then increased by 11.42% to $5.2 billion in 2024, then dropped by 3.63% to $5.0 billion in 2025.
- Its Construction in Progress stands at $5.0 billion for Q4 2025, versus $5.4 billion for Q3 2025 and $5.1 billion for Q2 2025.