Growth Metrics

Smart Powerr (CREG) Construction in Progress (2016 - 2019)

Historic Construction in Progress for Smart Powerr (CREG) over the last 10 years, with Q4 2019 value amounting to $23.8 million.

  • Smart Powerr's Construction in Progress changed N/A to $23.8 million in Q4 2019 from the same period last year, while for Dec 2019 it was $23.8 million, marking a year-over-year change of. This contributed to the annual value of $23.8 million for FY2019, which is N/A changed from last year.
  • As of Q4 2019, Smart Powerr's Construction in Progress stood at $23.8 million.
  • In the past 5 years, Smart Powerr's Construction in Progress ranged from a high of $158.0 million in Q1 2015 and a low of $23.8 million during Q4 2019
  • Moreover, its 5-year median value for Construction in Progress was $90.2 million (2017), whereas its average is $86.3 million.
  • Per our database at Business Quant, Smart Powerr's Construction in Progress surged by 5025.95% in 2015 and then plummeted by 7435.4% in 2019.
  • Over the past 5 years, Smart Powerr's Construction in Progress (Quarter) stood at $115.5 million in 2015, then dropped by 25.13% to $86.5 million in 2016, then increased by 10.03% to $95.2 million in 2017, then plummeted by 34.83% to $62.0 million in 2018, then tumbled by 61.58% to $23.8 million in 2019.
  • Its Construction in Progress stands at $23.8 million for Q4 2019, versus $24.4 million for Q3 2019 and $25.1 million for Q2 2019.