Smart Powerr (CREG) Construction in Progress (2016 - 2019)
Smart Powerr (CREG) has disclosed Construction in Progress for 10 consecutive years, with $23.8 million as the latest value for Q4 2019.
- Quarterly Construction in Progress changed N/A to $23.8 million in Q4 2019 from the year-ago period, while the trailing twelve-month figure was $23.8 million through Dec 2019, changed N/A year-over-year, with the annual reading at $23.8 million for FY2019, N/A changed from the prior year.
- Construction in Progress hit $23.8 million in Q4 2019 for Smart Powerr, down from $24.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $158.0 million in Q1 2015 to a low of $23.8 million in Q4 2019.
- Historically, Construction in Progress has averaged $86.3 million across 5 years, with a median of $90.2 million in 2017.
- Biggest five-year swings in Construction in Progress: skyrocketed 50.26% in 2015 and later crashed 74.35% in 2019.
- Year by year, Construction in Progress stood at $115.5 million in 2015, then dropped by 25.13% to $86.5 million in 2016, then grew by 10.03% to $95.2 million in 2017, then tumbled by 34.83% to $62.0 million in 2018, then tumbled by 61.58% to $23.8 million in 2019.
- Business Quant data shows Construction in Progress for CREG at $23.8 million in Q4 2019, $24.4 million in Q3 2019, and $25.1 million in Q2 2019.