Smart Powerr (CREG) Construction in Progress (2016 - 2019)
Smart Powerr's Construction in Progress history spans 10 years, with the latest figure at $23.8 million for Q4 2019.
- For Q4 2019, Construction in Progress changed N/A year-over-year to $23.8 million; the TTM value through Dec 2019 reached $23.8 million, changed N/A, while the annual FY2019 figure was $23.8 million, N/A changed from the prior year.
- Construction in Progress for Q4 2019 was $23.8 million at Smart Powerr, down from $24.4 million in the prior quarter.
- Across five years, Construction in Progress topped out at $158.0 million in Q1 2015 and bottomed at $23.8 million in Q4 2019.
- The 5-year median for Construction in Progress is $90.2 million (2017), against an average of $86.3 million.
- The largest annual shift saw Construction in Progress soared 50.26% in 2015 before it tumbled 74.35% in 2019.
- A 5-year view of Construction in Progress shows it stood at $115.5 million in 2015, then fell by 25.13% to $86.5 million in 2016, then rose by 10.03% to $95.2 million in 2017, then plummeted by 34.83% to $62.0 million in 2018, then plummeted by 61.58% to $23.8 million in 2019.
- Per Business Quant, the three most recent readings for CREG's Construction in Progress are $23.8 million (Q4 2019), $24.4 million (Q3 2019), and $25.1 million (Q2 2019).