Core Scientific, Inc./tx (CORZW) Construction in Progress (2023 - 2025)
Core Scientific (CORZW) reported Construction in Progress of $657.0 million for Q3 2025, up 327.01% on a YoY basis from $153.9 million in Q3 2024, and up 55.62% sequentially from $422.2 million in Q2 2025.
Core Scientific, Inc./tx (CORZW) Construction in Progress (2023 - 2025) Analysis & Trends
Core Scientific (CORZW) has 3 years of Construction in Progress data on file, last reported at $657.0 million in Q3 2025.
- For the quarter ending Q3 2025, Construction in Progress rose 327.01% year-over-year to $657.0 million; the trailing twelve-month figure through Sep 2025 stood at $657.0 million (up 327.01% YoY), and the FY2024 full-year result was $112.0 million, down 39.12% from the prior year.
- Construction in Progress advanced to $657.0 million in Q3 2025, from $422.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $657.0 million in Q3 2025 to a low of $112.0 million in Q4 2024.
- A 3-year average of $291.7 million and a median of $202.7 million in 2023 frame the typical range for Construction in Progress.
- Across the five-year window, Construction in Progress sank 39.12% in 2024 and jumped 327.01% in 2025, its largest moves.
- Tracing CORZW's Construction in Progress over 3 years: stood at $183.9 million in 2023, then slumped by 39.12% to $112.0 million in 2024, then surged by 486.78% to $657.0 million in 2025.
- Business Quant data shows CORZW's Construction in Progress at $657.0 million in Q3 2025, $422.2 million in Q2 2025, and $221.5 million in Q1 2025.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Sep 30, 2025 | 657.00 Mn |
| Jun 30, 2025 | 422.17 Mn |
| Mar 31, 2025 | 221.45 Mn |
| Dec 31, 2024 | 111.97 Mn |
| Sep 30, 2024 | 153.86 Mn |
| Dec 31, 2023 | 183.91 Mn |