Growth Metrics

Cenovus Energy (CNVEF) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Cenovus Energy (CNVEF) over the last 10 years, with Q4 2024 value amounting to $2.7 billion.

  • Cenovus Energy's Construction in Progress rose 3321.36% to $2.7 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $2.7 billion, marking a year-over-year increase of 3321.36%. This contributed to the annual value of $2.7 billion for FY2024, which is 3470.52% up from last year.
  • Per Cenovus Energy's latest filing, its Construction in Progress stood at $2.7 billion for Q4 2024, which was up 3321.36% from $2.0 billion recorded in Q4 2023.
  • Over the past 5 years, Cenovus Energy's Construction in Progress peaked at $2.7 billion during Q4 2024, and registered a low of $1.6 billion during Q4 2020.
  • Its 5-year average for Construction in Progress is $2.1 billion, with a median of $2.0 billion in 2023.
  • Per our database at Business Quant, Cenovus Energy's Construction in Progress skyrocketed by 7083.4% in 2021 and then tumbled by 3697.7% in 2022.
  • Cenovus Energy's Construction in Progress (Quarter) stood at $1.6 billion in 2020, then soared by 70.83% to $2.7 billion in 2021, then tumbled by 36.98% to $1.7 billion in 2022, then rose by 20.31% to $2.0 billion in 2023, then skyrocketed by 33.21% to $2.7 billion in 2024.
  • Its Construction in Progress stands at $2.7 billion for Q4 2024, versus $2.0 billion for Q4 2023 and $1.7 billion for Q4 2022.