Caledonia Mining (CMCL) Work In Process (2016 - 2025)
Historic Work In Process for Caledonia Mining (CMCL) over the last 9 years, with Q4 2024 value amounting to $3.1 million.
- Caledonia Mining's Work In Process rose 3269.65% to $3.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $3.1 million, marking a year-over-year increase of 3269.65%. This contributed to the annual value of $3.1 million for FY2024, which is 3269.65% up from last year.
- As of Q4 2024, Caledonia Mining's Work In Process stood at $3.1 million, which was up 3269.65% from $2.3 million recorded in Q4 2023.
- Over the past 5 years, Caledonia Mining's Work In Process peaked at $3.1 million during Q4 2024, and registered a low of $243000.0 during Q4 2021.
- Over the past 5 years, Caledonia Mining's median Work In Process value was $1.2 million (recorded in 2020), while the average stood at $1.5 million.
- Its Work In Process has fluctuated over the past 5 years, first plummeted by 7915.95% in 2021, then soared by 23425.25% in 2023.
- Over the past 5 years, Caledonia Mining's Work In Process (Quarter) stood at $1.2 million in 2020, then tumbled by 79.16% to $243000.0 in 2021, then soared by 183.54% to $689000.0 in 2022, then surged by 234.25% to $2.3 million in 2023, then skyrocketed by 32.7% to $3.1 million in 2024.
- Its Work In Process was $3.1 million in Q4 2024, compared to $2.3 million in Q4 2023 and $689000.0 in Q4 2022.