Cellectis (CLLS) Construction in Progress: 2020-2021
- Cellectis' Construction in Progress rose 37.29% to $41.4 million in Q2 2021 from the same period last year, while for Jun 2021 it was $41.4 million, marking a year-over-year increase of 37.29%. This contributed to the annual value of $1.0 million for FY2023, which is 23.08% down from last year.
- Per Cellectis' latest filing, its Construction in Progress stood at $41.4 million for Q2 2021, which was up 37.29% from $30.2 million recorded in Q2 2020.
- Over the past 5 years, Cellectis' Construction in Progress peaked at $41.4 million during Q2 2021, and registered a low of $30.2 million during Q2 2020.
- For the 2-year period, Cellectis' Construction in Progress averaged around $35.8 million, with its median value being $35.8 million (2020).
- Data for Cellectis' Construction in Progress shows a peak YoY skyrocketed of 37.29% (in 2021) over the last 5 years.
- Quarterly analysis of 2 years shows Cellectis' Construction in Progress stood at $30.2 million in 2020, then skyrocketed by 37.29% to $41.4 million in 2021.