Blue Line Protection (BLPG) Construction in Progress (2016)
Historic Construction in Progress for Blue Line Protection (BLPG) over the last 3 years, with Q1 2016 value amounting to $1.2 million.
- Blue Line Protection's Construction in Progress changed N/A to $1.2 million in Q1 2016 from the same period last year, while for Mar 2016 it was $1.2 million, marking a year-over-year change of. This contributed to the annual value of $1.1 million for FY2015, which is 442.27% up from last year.
- As of Q1 2016, Blue Line Protection's Construction in Progress stood at $1.2 million.
- Blue Line Protection's Construction in Progress' 5-year high stood at $1.2 million during Q1 2016, with a 5-year trough of $1.1 million in Q4 2014.
- Its 3-year average for Construction in Progress is $1.2 million, with a median of $1.1 million in 2015.
- Data for Blue Line Protection's Construction in Progress shows a peak YoY increase of 442.27% (in 2015) and a maximum YoY decrease of 442.27% (in 2015) over the last 5 years.
- Quarter analysis of 3 years shows Blue Line Protection's Construction in Progress stood at $1.1 million in 2014, then rose by 4.42% to $1.1 million in 2015, then grew by 5.41% to $1.2 million in 2016.
- Its Construction in Progress stands at $1.2 million for Q1 2016, versus $1.1 million for Q4 2015 and $1.1 million for Q4 2014.