Growth Metrics

Ballard Power Systems (BLDP) Amortization (2016 - 2025)

Ballard Power Systems has reported Amortization over the past 17 years, most recently at $33.0 million for Q3 2025.

  • Quarterly Amortization rose 183.48% to $33.0 million in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $33.0 million through Sep 2025, down 98.3% year-over-year, with the annual reading at $35.6 million for FY2024, 10.23% down from the prior year.
  • Amortization was $33.0 million for Q3 2025 at Ballard Power Systems, down from $33.5 million in the prior quarter.
  • Over five years, Amortization peaked at $2.0 billion in Q4 2023 and troughed at -$39.5 million in Q3 2024.
  • The 5-year median for Amortization is -$10.3 million (2021), against an average of $208.4 million.
  • Year-over-year, Amortization crashed 381.32% in 2022 and then surged 15423.85% in 2023.
  • A 5-year view of Amortization shows it stood at -$7.1 million in 2021, then surged by 282.68% to $13.0 million in 2022, then surged by 15423.85% to $2.0 billion in 2023, then changed by 0.0% to $2.0 billion in 2024, then crashed by 98.37% to $33.0 million in 2025.
  • Per Business Quant, the three most recent readings for BLDP's Amortization are $33.0 million (Q3 2025), $33.5 million (Q2 2025), and -$21.7 million (Q1 2025).